top of page
Lybrae Spatial Solutions – Home

Preparing for an EIA in Kenya: What to Bring to the First Meeting

Nov 2
3 min read

A useful first EIA consultation starts with a clear account of the project, its site and its current planning stage. Bring the information you hold, identify what is missing and ask the responsible environmental expert to establish the applicable assessment route and work programme.


This preparation guide helps a project proponent organise that first brief in Kenya. It is a working checklist for the discussion; the actual submission requirements depend on the project and the current NEMA requirements.


Describe the whole proposal


Explain what will be built or operated, its location, scale and activities. Include associated works such as access, servicing, drainage, waste handling or supporting facilities where they form part of the proposal.


Describe the construction, operational and eventual closure stages as far as they are known. Identify alternatives still under consideration and decisions that can still change. An accurate brief helps the expert identify the information needed for assessment before a design assumption becomes difficult to revisit.


NEMA's EIA service guidance explains that assessment pathways can involve project reports or a study, with further work depending on the applicable requirements and the Authority's review. Establish the route before commissioning a generic report template.


Bring the available property and planning records


Useful starting records may include:


  • The parcel reference, location information and documents showing the proponent's relationship to the site.

  • Available site layouts, drawings, project descriptions and development schedules, with revision dates.

  • Existing planning permissions, approved amendments and related correspondence.

  • Previous environmental reports, licences, audit reports or other relevant decisions for the site.

  • Details of the project team and the person authorised to answer questions and confirm the brief.


Ask the expert to identify what must be verified or supplemented. Use a document register so the team can distinguish an approved drawing from a working concept and an issued decision from an application still under consideration.


Our planning due diligence service can help organise the planning questions that need to be coordinated with the environmental instruction.


Explain the site and its neighbours


Identify the existing use, neighbouring activities, access arrangements and known environmental or social concerns. Share photographs and existing studies with their dates and sources. Record the limits of what has been observed.


Ask what field visits, specialist investigations or baseline information will be needed. A desktop map can help direct those enquiries, while site conditions and the assessment questions determine the evidence that must be gathered.


For the wider relationship between records and field evidence, see our guide to GIS, surveys and planning baselines.


Agree the expert's scope and responsibilities


Confirm who will lead the assessment and undertake any specialist work. NEMA publishes information on expert registration and practising licences. Check the credentials and current practising position of the expert or firm responsible for the statutory work.


Ask the proposal to identify the assessment pathway, investigations, participation activities, deliverables, review stages and responsibilities for providing information. Clarify whether additional studies, repeat visits, responses to queries or revisions following design changes are included in the fee.


Plan participation around the actual assessment


Discuss which people and institutions may be affected or hold relevant information, what information they need and how their views will be sought and recorded. The responsible expert should establish the applicable participation and disclosure requirements.


Make practical arrangements for access, communication and record keeping. Record concerns and the team's response to them. The participation record should show how the assessment addressed material issues, including those that remain unresolved.


Keep the programme and budget realistic


Separate the time needed for preparation, fieldwork, specialist inputs, participation, report review and authority consideration. Identify decisions or missing information that could change the scope.


Request an itemised cost schedule separating professional work, specialist inputs, authority charges and other confirmed disbursements. NEMA's 2025–2027 Customer Service Charter distinguishes assessment services and sets out customer obligations. Confirm current charges and the applicable route for the actual instruction.


Prepare for submission and the work after a decision


Before submission, reconcile the report with the current project description and drawings. Confirm that the evidence, supporting records, authorisations and responsible persons have been checked.


Ask how the team will track submission, requests for information and the eventual decision. If approval is issued, identify who will read the conditions, organise implementation and maintain the required records. The management measures developed during assessment need a place in the project's delivery arrangements.


Our guide to online EIA submission explains the relationship between digital submission and the underlying assessment work.


Arrange the first discussion


Share the site location, project description, current stage and documents already available. Through our environmental and social impact assessment service, the responsible team can identify a suitable scope and the information needed to progress it. Discuss your project with Lybrae.

bottom of page