Development Applications That Don’t Fail: A Playbook for Developers

Updated: Aug 25

How to turn a concept into a permitable, fundable, buildable development — without the usual fights, delays, and surprise costs.

Developers who treat the development application as a checklist lose money, time and credibility. In Kenya today, a successful development application is a systems exercise: it must thread statutory planning, environmental clearance, land & tenure certainty, utility readiness, construction compliance, and community legitimacy into a single, auditable data room. Do that and you cut approval times, lower financing spreads, and make your site irresistible to investors and operators. Miss any part and you’ll be rewriting designs, paying for contingencies, and losing tenants before you open the gate.

Why the development application is the single most important investment decision you’ll make

A development application is more than a permit — it is a risk filter used by lenders, insurers and off-takers. A clean, defensible approval reduces: lender due-diligence time, conditionalities in PPPs, and the probability of costly litigation or stop-work orders. Done badly, it becomes the place where projects die: value is destroyed not by markets but by avoidable regulatory and social frictions.


The legal & regulatory stack every developer must master (and where to read it)

In Kenya the planning and approval regime is layered and prescriptive. Your application must be able to be traced through this stack:

  • Physical & Land Use Planning Act (No. 13 of 2019) — the backbone for spatial plans, local plans, zoning and development permission. This Act defines planning institutions and sets the legal basis for development control.

  • Physical & Land Use Planning (General Development Control) Regulations (LN 253/2021) — the regulations that set forms, submission rules (including electronic submission), and minimum documentation for development control applications. These regulations are where you find the “how” for applications.

  • Environmental authorizations (NEMA) — projects must pass screening/scoping and, where required, secure an EIA/ESIA licence from NEMA with public participation requirements and monitoring obligations. Environmental clearances are often gating conditions for financing.

  • National Construction Authority (NCA) & the National Building Code — construction professionals, contractors and many projects require registration with NCA; the Building Code (now updated) sets technical standards and inspection regimes that counties will reference.

  • County systems & e-portals (example: Nairobi Plan Portal) — counties are responsible for issuing development permissions and building approvals under devolved functions. Many counties now run online portals and published guidance for submissions; e-filing, payments and SLA enforcement are increasingly digital.


(Other crucial statutes: Land Act & Land Registration Act (title clarity), County Governments Act (devolved functions and public participation), Community Land Act (where community land is involved), Public Health and Fire/Rescue regulations.)


Architect and planner review a development site plan on a construction parcel with Nairobi skyline behind them — illustrating permit coordination, planning and county portal use.
An ongoing Construction Site After Review by Architects & Planners at a Site in Nairobi

The step-by-step application flow (practical, real world)

Think of this as the critical path you must own from day one.

  1. Pre-feasibility & site clearance (Days 0–14)

    • Confirm title: obtain a land search, encumbrance register, caveats, pending interests, and survey plan. Check for community land claims.

    • Quick hazard & constraints scan: buffers, riparian zones, floodplains, protected areas, wayleaves, existing easements.

    • Early engagement: informal meetings with the county physical planner, water/energy utilities, and (if needed) NEMA. A documented pre-application meeting reduces surprises later.

  2. Technical studies & package build (Weeks 2–8)

    • Mandatory drawings: site/location plan, architectural plans, structural sketches, drainage plan, landscaping, parking, traffic impact (if required).

    • Specialist reports: geo-technical/soils, flood & hydrology, traffic, noise (for industrial or entertainment uses), drainage and surface-water, and utilities headroom (letters from water/energy providers).

    • E&S: screening form; if indicated, full ESIA (scoping, public consultation, EIA report). NEMA’s process must be followed exactly.

  3. Professional certifications & registrations (parallel)

    • Ensure plans and calculations are stamped by registered professionals (architect, structural engineer, registered planner where required).

    • Register the project with NCA and ensure main contractor is NCA-registered before works start. NCA project registration is a pre-construction step for many developments.

  4. Submission & payment (the formal filing) — follow the county portal rules

    • Electronic submission is now permitted/required in many counties; upload the complete package, pay prescribed fees, and request a formal receipt. Regulations make clear: an application is not “duly completed” until prescribed fees are paid.

  5. Technical review, consultations & public participation (4–12 weeks typical, variable)

    • The county convenes technical teams (planning, fire, public health, roads), circulates to utilities and may instruct addenda. Public participation is mandatory for many categories — document it rigorously. Expect conditions and requests for clarifications.

  6. Decision (approval, conditional approval, or refusal)

    • Approval will come with conditions (e.g., revise drainage, provide stormwater retention, grade levels, pay levies). Conditional approvals are normal — treat the conditions as binding deliverables for financiers.

  7. Construction phase compliance

    • Build only with the approved documents. Inspections, site-supervision certificates, and NCA milestones must be tracked. Deviations require formal revision applications. NCA & county inspectors enforce compliance and can issue stop-work orders.

  8. Completion & occupation

    • Apply for completion/occupation certificates (county + utilities as needed). NEMA may require a compliance report against EIA conditions before final sign-offs. Only upon occupation certificate can tenants legally occupy.


The things developers reliably get wrong (and how to stop them)

  • Mistake: Submitting incomplete packages (missing headroom letters, soil reports, or NCA project registration).

    Fix: Use a pre-submission checklist mapped to LN 253/2021 and the county portal requirements.

  • Mistake: Treating EIA as a late check-box.

    Fix: Screen at concept stage; where scoping is required, run it fast and budget for community consultation and mitigation measures. NEMA timelines and conditions are non-negotiable.

  • Mistake: Ignoring utility headroom (water, sewer, power, fiber).

    Fix: Secure letters of supply (or confirmed upgrade plans) from service providers and build their costs and timelines into your cashflow and construction programme.

  • Mistake: Informal verbal promises from county staff.

    Fix: Get written confirmations, logged meeting minutes, and portal receipts; rely on published SLAs.

  • Mistake: Changing scope during construction without a formal revision.

    Fix: Plan for variations; use change-control with approvals before execution.


Must-have documents for a “no-surprises” application (developer’s checklist)

  • Clear title or land search & certified plan.

  • Site location and site layout plans (dimensioned & scaled).

  • Architectural drawings (floor plans, elevations).

  • Structural calculations / engineer’s designs.

  • Soils/geotech report.

  • Drainage & stormwater management plan.

  • Traffic Impact Assessment (if access or parking affected).

  • NEMA screening form or full ESIA report & evidence of public participation.

  • Utility headroom letters (water, sewer, power, telecom).

  • Fire safety report & water supply for firefighting.

  • Registered professional stamps (architect, engineer, planner where applicable).

  • NCA project registration confirmation.


Timelines, fees & expectations (be realistic)

  • Timelines vary by county and by project complexity. Simple single-use residential or single-storey commercial applications may clear faster; major mixed-use or industrial projects that require ESIA and multiple utility upgrades take longer. Electronic filing and a clean package materially shorten review cycles. Regulations emphasize that an application is only complete once prescribed fees are paid.

  • Fees: county and NEMA fees vary; some NEMA processing/monitoring levies are tied to project cost — always budget for statutory fees, monitoring bonds and contingencies for mitigation measures. (Check NEMA and the county portal for up-to-date schedules.)


How to de-risk the application for financiers and insurers

  • Build a data room: full package, E&S compliance log, utility MOUs, land history, community engagement records, and a clear permit critical-path schedule. Lenders underwrite permits; a tidy data room shortens diligence and often lowers debt pricing.

  • Use conditional bonds & escrowed LVC where value capture is expected to fund off-site works.

  • Insurers want proof of compliance: they will ask for NCA contractor registration, professional indemnity evidence, and EIA compliance guarantees.


The political & social dimension — don’t treat it as optional

Public participation isn’t a theatre. Done well, it becomes a shield: community agreements, local employment commitments, and clear grievance mechanisms reduce litigation risk and ensure the project’s social licence. Early benefit sharing and transparent disclosure of mitigation measures cut opposition and create allies.


Do’s and don’ts — the hard checklist (read at your peril)

Do:

  • Run a pre-application meeting with the county planner and utilities.

  • Register and validate all professional stamps and NCA project registration early.

  • Budget for ESIA, public participation, and monitoring if flagged.

  • Deliver an auditable project data room to lenders.

  • Keep revisions minimal by locking major decisions pre-submission.

Don’t:

  • Assume verbal promises substitute for written approvals.

  • Start construction on any component without the relevant inspection sign-offs.

  • Hide known site risks (flooding, contaminated soils, encumbrances).

  • Ignore local planning instruments: CIDPs, adopted local physical plans, and zoning.


Why you should let specialists (like us) run your development application

Time and again we see the same pattern: developers try to save a little on fees by doing “the application” themselves and end up spending multiples on delays, redesigns and compliance penalties. Here’s what a full-service specialist (like Lybrae Spatial Solutions) delivers:

  • Single accountable partner across planning, ESIA, land, utilities and construction compliance — we coordinate the entire architecture of approvals.

  • Data-first applications: We prepare a lender-grade data room so financing follows fast.

  • Pre-emptive risk reduction: Early title clearance, community compacts, and utility MOUs reduce conditionalities from lenders and NEMA.

  • Faster approvals: We manage portal submissions, checklist-driven completeness, and SLA escalation paths with county planners.

  • Cost containment: We price mitigation into the capex and avoid surprise scope changes mid-build.

  • Regulatory IQ: We know the Acts, the Regulations and the county procedural quirks so you don’t learn them the expensive way.


If your project’s merit can be measured in minutes, not months, you capture market windows, tenant pre-leases and better financing. We make that happen.


If you’re serious about turning land into investable, revenue-producing assets — don’t let the application be the place you learn how the system works. Hand us the package. We’ll pre-clear risks, build the lender-grade data room, and take the permit risk off your balance sheet. Ready for a no-nonsense permit audit? Let’s run your project through our 30-point pre-submission scan and tell you exactly what will slow you down — and how much time and money we’ll save you.