Study or technical report
Second Kenya Urban Support Program: Environmental and Social System Assessment, May 2023
May 2023
An assessment of environmental, social, health and safety systems and institutional capacity for the KUSP II programme. Useful for investigating programme risks, safeguards responsibilities, consultation and capacity-strengthening measures. This record identifies the May 2023 report; earlier drafts and later programme documents require their own version checks.
The current official downloads page links a May 2023 report without a draft label on the cover. It is not the April 2023 draft found in the World Bank index. Later revisions and operative programme requirements remain unverified.
Resource details
Geographic coverage
Kenya
Author
World Bank
Topics: Environmental assessment and safeguards · Planning institutions and mandates · Plan delivery and institutional capacity
Planning tasks: Design, finance and deliver an intervention · Assess a site or development proposal
Cite this resource
World Bank. Second Kenya Urban Support Program: Environmental and Social System Assessment, May 2023. 2023.
AT THE SOURCE
Read the resource
Opens on the source website in a new tab.
Access and reuse
Permission to reproduce or adapt this source has not been established. Lybrae provides a catalogue description and an external source link; consult the source’s own reuse terms.
The file has 158 pages, 141 with more than 50 extracted characters, and 0 bookmarks. These indicators and the cover inspection do not establish usable reading order, accessible maps, tables or diagrams, or screen-reader compatibility.
